Most delays are not craftsmanship problems. They happen in the gaps between the people doing the work — which is an argument for having fewer gaps.
Ask anyone who has been through a difficult build what went wrong and you will rarely hear that the framing was bad. What you hear about is waiting: waiting for a drawing to be revised, waiting for one trade to finish so another can start, waiting for somebody to take responsibility for a decision nobody wants to own.
Those are not craftsmanship failures. They are coordination failures, and they happen at the seams — every point where the project passes from one company to another.
Where the seams usually are
A typical residential project can involve a designer, a structural engineer, a general contractor and a long tail of subcontractors. Each hand-off is a chance for scope to be assumed rather than agreed, and for a schedule to slip without anyone being obviously at fault.
The classic example is a design that has never been priced. Drawings get produced, everyone admires them, and only when a builder puts a real number against them does it emerge that the design was never affordable. Now you are paying to redraw it.
What removing the seams changes
When design, engineering and construction sit under one roof, pricing happens while the drawing is still cheap to change. Specification decisions get tested against cost during design rather than during framing, which is the difference between an edit and a rebuild.
It also changes accountability. If the same organisation drew it, engineered it and built it, there is no useful argument about whose fault a problem is — which tends to mean the problem simply gets solved.
What to ask a builder
Who produces the drawings, and are they priced before they are finalised? Which trades do you self-perform, and which do you subcontract? Who is my single point of contact, and will that person still be there in month six?
The answers matter more than the brochure. A builder who self-performs the structural work has direct control over the part of the programme that everything else waits on.