
Service 03
Commercial Properties
Design-build and construction management for LA businesses — scheduled around your operations, not ours.
Occupied
We build around your trading hours
Phased
Staged handover, area by area
Self-performed
Our own framing and carpentry crews
Commercial work lives or dies on scheduling. Most of our commercial clients are still trading while we build, so the plan has to be written around their operations rather than our convenience.
What that covers
- Renovation of occupied interior space
- Framing and carpentry
- Electrical systems and lighting
- Roof installation and replacement
- Exterior remodel and additions
- Demolition

01
Renovation of occupied space
Phased work, out-of-hours scheduling and clean separation between the working business and the active site, so you keep your doors open through the project.

02
Structure and envelope
Framing and carpentry, roof installation and replacement, exterior remodel and additions — carried by the same crews that build our residential work.

03
Systems
Electrical systems and lighting coordinated with the build programme rather than bolted on at the end.

04
Demolition
Documented, controlled removal of what has to come out — and nothing that does not.
How the work runs, start to finish.
01
Design & pre-construction
Our own architects, engineers and designers work up the drawings, the engineering and a real budget — so what gets priced is what actually gets built.
02
Permits & site preparation
We carry the plans through approvals, then handle grading, excavation and foundation. Nothing waits on a subcontractor we do not control.
03
Structure & systems
Framing, roofing, windows and doors, electrical and mechanical, insulation and drywall — the house closed in and made weather-tight.
04
Finishes & walkthrough
Exterior and interior finishes, cabinetry, tile and finish carpentry, followed by a walkthrough with the same people who ran the build.
Common questions
Can you work outside business hours?
Yes. Where a business needs to keep trading, we phase the work and schedule the disruptive stages around opening hours.
Do you take on tenant improvements?
Yes — interior build-outs and improvements to leased space are a regular part of our commercial work.
How do you handle an occupied building?
With hard separation between site and operations: dust control, protected routes, and staged handover of areas as they complete.
Recent work
See the full gallery →



Planning a commercial properties project?
Send us the details and we will come back to you with next steps — or call and speak to us directly.


